Storage cupboard mould
Storage Cupboard Mould
Product material PP, PC, PS, PE, PU, PVC, ABS, PMMA etc.
Core&Cavity Steel 718H, P20, NAK80, 2316
Steel hardness: HRC28-33
Mould Standard DME
Cavity Number single or multi
Injection System DIRECT GATE
Ejector System EJECTOR PIN
Cycle Time 120S
Tooling lead time 120DAYS
Mould life 500,000SHOTS
Quality assurance ISO9001
Product Details
Place of Origin | Zhejiang, China (Mainland) |
Brand Name | Aojie Mould |
Shaping Mode | Plastic Injection Mould |
Product Material | Plastic |
CNC Machining Tolerance | 0.003to 0.005mm |
Core & Cavity Material | P20, 718,2316... |
Runner shot | Cold or Hot runner |
Mold life | 300.000 shots-500.000 shots. |
Cycle time | 30-50s |
Delivery time | 45-60 days |
Package | STANDARD Wooden case |
Delivery | By sea |
Different size and shape according to your requirements |
Q: What services do you provide?
A: We manufacture plastic injection molds and produce plastic injection parts for sampling and bulk production.We also provide mold design services.
Q: How can I contact you?
A: You can send us an inquiry via email, WhatsApp, Skype or Wechat. We will reply to you within 24 hours.
Q: How can I get a quotation?
A:After receving your RFQ, we will reply to you within 2 hours. In your RFQ, please provide the following information and data in order for us to send you competitive pricing based on your requirements.a) 2D part drawings in PDF or JPG format & 3D part drawings in UG, PRO/E, SOLIDWORKS, CATIA, CAD, STP, X_T, IGS, PRT, DWG, or DXFb) Resin information (Datasheet)c) Annual quantity requirement for parts
Q: What shall we do if we don’t have part drawings?
A: You can send us your plastic part samples or photos with dimensions and we could provide you our technical solutions. We will create .
Q: Can we get some samples before mass production?
A: Yes, we will send you samples for confirmation before start of mass production.
Q: Due to time difference with China and overseas, how can I get information about my order progress?
A: Every week we send weekly production progress report with digital pictures and videos that shows the production progress.
Q: What is your leadtime?
A: Our standard leadtime for mold production is 4 weeks.For plastic parts is 15-20 days depending on the quantity.
Q: What is your payment term?
A: 50% as payment deposit, 50% balance will be paid before shipping. For small amount, we accept Paypal, Paypal commission will be added to the order. For big amount, T/T is preferred
Q: How can I guarantee our quality?
A: During mold making, we do material and part inspection. During part production, we do 100% full quality inspection
before packaging and reject every parts that is not according to our quality standard or the quality approved by our client.